Home » News » New plan for power link

New plan for power link

A NEW preferred option has emerged for an overhead transmission line between Victoria and New South Wales, with Kerang still playing a key role. The top option for the VNI West interconnector, also dubbed KerangLink, was now a 500 kV double-circuit overhead transmission line. It would link up Victoria’s Western Renewables Link at Bulgana with […]

Subscribe or Login to see the rest of the content.

Digital Editions


  • Let there be light at Christmas

    Let there be light at Christmas

    Christmas lights … let’s think about the concept. Why is Australia so big on them? Most people, if you ask them, mention children when thinking…