Home » News » New plan for power link

New plan for power link

A NEW preferred option has emerged for an overhead transmission line between Victoria and New South Wales, with Kerang still playing a key role. The top option for the VNI West interconnector, also dubbed KerangLink, was now a 500 kV double-circuit overhead transmission line. It would link up Victoria’s Western Renewables Link at Bulgana with […]

Subscribe or Login to see the rest of the content.

Digital Editions


  • Identifying project priorities

    Identifying project priorities

    GANNAWARRA Shire residents are being encouraged to have their say on a draft plan that will guide the council’s approach to managing infrastructure during the…